New Office Network From Scratch: The Checklist
Moving or opening? Internet, firewall, Wi-Fi, drops, and phones — the order that prevents day-one disasters.
1. Order internet 30+ days out
Business fiber and cable installs take weeks, construction longer. Order before setting the move date around connectivity — openings get delayed a month by this single mistake.
2. Cable before furniture, Wi-Fi before users
Run Cat6 to every desk, printer, camera, and AP location while walls are open ($125–$200 per drop beats $400 retrofits). Plan access-point spots on a floor map, not by guessing.
3. Stage everything before move day
Firewall rules, Wi-Fi networks, printers, and phones configured and tested the week before. Move day should be plug-in-and-work, with us on-site for the inevitable surprises.
4. Cut over phones and test externally
Port numbers Friday evening, test inbound and outbound Monday from outside lines. Keep one old line live a week as the rollback parachute.
New Office Network From Scratch: The Checklist — When to Call a Pro
- Full build-out: design, cabling coordination, install, and day-one support.
- Multi-floor or warehouse spaces needing surveyed wireless.
- Tight timelines where staging and after-hours cutovers matter.