4 min read · Beginner · Related: Managed IT Services
Updated October 2026 · Tampa Bay–tested steps
Size a UPS So Shutdowns Stay Graceful
VA ratings, runtime math, and managed shutdowns — buy the right battery once instead of the wrong one twice.
1. Add up the watts that matter
List modem, router, switch, server, and one workstation with their wattage (labels or a $25 kill-a-watt). Size UPS at 1.5x that total in VA — headroom handles startup surges and battery aging.
2. Buy runtime for shutdown, not workdays
Target 20–30 minutes: enough to ride out blips and shut down cleanly. All-day runtime needs generators, not batteries — mismatched expectations waste thousands.
3. Connect USB and configure auto-shutdown
USB cable from UPS to server/NAS with the vendor software set to graceful shutdown at 5 minutes remaining. Unmonitored UPS units just delay the crash; configured ones prevent it.
Size a UPS So Shutdowns Stay Graceful — When to Call a Pro
- Sizing and install across server room, registers, and network closets.
- Generator + UPS layered design for extended outages.
- Battery replacement programs (batteries die every 3–5 years, silently).
Guide FAQ
Keep going on Managed IT Services
Related service: Managed IT Services →